Supply of materials and labor to repair the 3 entry ports and the insulation cord. The excellent performance of protective gunning on the sidewalls of the boiler was also confirmed, this being carried out around the entire perimeter.
The following products were used during this work: HORLITE 124 VBG insulating concrete and HORGUN SIC 5073 dense gunning concrete.